Building-permit information file (Tik Meida)
Israel · each local planning committee · תיק מידע להיתר
₪271.30 incl. VAT (₪259.20 before VAT) · statutory period (not stated on page) · order and pay online
Order this report
What the report shows
Committee's official data for a plot: applicable plans, building rights and restrictions, infrastructure, permitted uses, design requirements and betterment-levy liability.
Who needs it
architects, owners planning construction, developers, buyers of land
Why people order it
mandatory first step before a permit application; feasibility checks
What we need from you
- ✍️Details you type in the form: address/block/parcel, applicant and plan-preparer details, survey map
- ✅No original document and no post — everything happens online.
Issued by
הוועדה המקומית לתכנון ובנייה (local planning and building committee)
Questions and answers
How do I order Building-permit information file (Tik Meida) online?
Fill in address/block/parcel, applicant and plan-preparer details, survey map in the form on this page, pay ₪271.30 by card, and the document is e-mailed to you within statutory period (not stated on page).
How much does Building-permit information file (Tik Meida) cost?
₪271.30 including VAT on the service part (₪259.20 before VAT), including the official fee of ₪192.00.
How long does Building-permit information file (Tik Meida) take?
statutory period (not stated on page).
Who can order Building-permit information file (Tik Meida)?
Anyone.
Do I need to send the original document?
No. Everything is online — no original and no post.
Terms
Work starts as soon as you pay; once the document is delivered the order can no longer be cancelled.
Joy Work OS is a private service and not the issuing authority. You can also order this document directly from the authority at the official fee.